Vaillant flue pipe blanking plug DN 80

Code: 0010044784
Not rated Rating details
87 € –5 %
87 € –5 % 82,65 € / pcs 67,20 € excl. VAT Measure price:
International delivery
In stock at supplier

Detailed information

Product detailed description

Vaillant flue pipe blanking plug DN 80

The DN 80 flue pipe blanking plug from Vaillant is a service and safety component designed for temporary or permanent sealing of the opening left after a disconnected or removed flue gas discharge pipe with a DN 80 bore. This type of plug is used in several typical situations – when replacing an old boiler with a new one that has a different flue system (where it is necessary to seal off the original, now unused pipe penetration through a wall or roof), when temporarily decommissioning a boiler for a longer period (for example during renovation), or during service work where it is necessary to temporarily close the flue pipe for safety reasons or to prevent dirt or insects from entering the system.

Why the flue opening should not be left freely open

An opening left after a disconnected or unused flue pipe poses several risks if left freely open – primarily, it creates a direct passage between the outdoor environment and the interior of the building, through which heat can escape (increasing heating costs), and rain, moisture, insects or small animals can enter the pipe and potentially the building itself. If it is a shared or common chimney system, an unsealed opening can also disrupt the pressure conditions and safe operation of the rest of the system. For this reason, it is advisable – and in many cases essential – to promptly and reliably seal every unused flue opening with a certified plug of the appropriate diameter.

Why choose the DN 80 diameter

This plug is dimensioned exactly for a DN 80 bore, which corresponds to the standard flue pipe diameter used on several types and output categories of Vaillant gas boilers. Before ordering, it is essential to verify the actual diameter of your existing flue pipe (for example, according to the original technical documentation of the boiler or by direct measurement), since using a plug with the wrong diameter would not guarantee a sufficiently tight seal.

Material and construction

The plug is made from a material resistant to temperature and weather effects it may be exposed to when installed on the facade or roof of a building, with a design that ensures reliable and tight sealing of the flue pipe opening. This resistance is particularly important for long-term, not just short-term use of the plug, for example when permanently decommissioning an unused chimney flue after replacing a boiler with a unit that has a different flue system.

Installation

Installing the plug involves fitting it into the DN 80 flue pipe opening according to the manufacturer's installation instructions, with an emphasis on achieving reliable sealing against the penetration of air, moisture and dirt. When sealing the opening after a disconnected boiler, we recommend entrusting this installation to the same professional company that carries out the boiler replacement or decommissioning itself, as this company is familiar with the overall condition and type of the original flue system and can assess whether the plug alone is a sufficient solution or whether additional construction sealing around the pipe penetration through the wall or roof is also needed.

Compatibility

This plug is designed for flue pipes with a DN 80 bore, commonly used on several models and generations of Vaillant gas boilers. Before ordering, we always recommend verifying the exact diameter of your existing pipe, or contacting us with information about the type and model of the boiler that was originally connected to that pipe, so we can confirm the correct choice of plug diameter.

When to consider a professional inspection instead of just the plug

When permanently decommissioning a chimney or flue system (for example after switching to a completely different heating method), we recommend that, in addition to fitting this plug, you also consider having a chimney sweep inspect the flue to confirm that its decommissioning complies with applicable regulations, and to recommend any further steps if needed (for example permanent structural sealing of the penetration, not just fitting a plug into the pipe). This step is particularly important for shared or common chimney systems in multi-storey buildings.

Maintenance

This plug does not require any special regular maintenance, however, if it is installed outdoors for a long period (for example on a facade), we recommend occasionally checking its condition and tightness, especially after more extreme weather events (strong wind, storm), since mechanical damage or loosening of the plug could restore the risks associated with a freely open pipe that it was originally intended to prevent.

Why choose an original Vaillant plug

The original Vaillant plug is designed precisely to the DN 80 dimension corresponding to the flue pipe used on boilers of this brand, with material and construction proven in terms of long-term resistance to weather effects. An improvised solution (for example sealing the opening with uncertified material) would not necessarily provide comparable long-term reliability or tightness.

Frequently Asked Questions

When do I need a flue plug?

The plug is used when replacing a boiler with a unit that has a different flue system, during temporary or permanent decommissioning of a boiler, or during service work where it is necessary to temporarily close the flue pipe.

How do I find the correct plug diameter for my pipe?

Check the diameter according to the original technical documentation of the boiler that was connected to that pipe, or by direct measurement. If in doubt, contact us with information about the boiler type.

Is this plug also suitable for permanently sealing a chimney?

When permanently decommissioning a chimney system, we recommend that, in addition to fitting the plug, you also consider having a chimney sweep inspect it to confirm compliance with applicable regulations and possibly recommend further construction measures.

Can I install the plug myself?

Installation is simple, but we recommend entrusting it to a professional company, especially if it involves sealing after a disconnected boiler, as the company can also assess the overall condition of the original flue system.

What is the warranty on this part?

We provide the standard statutory 2-year warranty on this original Vaillant part.

Broader context – responsible decommissioning of an old heat source

When replacing an old boiler with a new one, or switching to a completely different heating method (for example a heat pump that does not require a chimney flue gas outlet), the responsible and safe decommissioning of the original flue system is just as important a part of the project as the installation of the new heat source itself. Neglecting to properly seal an unused flue opening can have consequences not only for heat loss and living comfort, but also, in the case of shared chimney systems, for the safety of other occupants of the building connected to the same system.

We recommend including this plug in the budget and implementation plan already when ordering a boiler replacement, so that the installation company can seal the old opening during the same visit as the installation of the new heat source and its flue, without the need for an additional, separate visit just for this supplementary but important step.

Difference between the DN 80 and DN 60 plug

Vaillant offers flue plugs in two common diameters – DN 80 (this item) and DN 60 (a smaller diameter, used on other boiler models and configurations). These two diameters are not interchangeable, as they correspond to different flue pipe diameters used on various types and output categories of Vaillant boilers. Before ordering, it is therefore essential to accurately verify the diameter of the pipe in your specific installation – if in doubt, we recommend physically measuring the internal diameter of the opening rather than relying solely on an estimate based on the age or type of the original boiler.

Situations where it is advisable to order the plug in advance

Although a flue plug is usually ordered only when it is needed (for example just before a planned boiler replacement), in some cases it is worth having one available in advance – for example if you plan to decommission the boiler for a longer period (a long stay away from the property, a seasonally occupied building), or if you are carrying out construction work near the flue penetration through the facade or roof, where it is advisable to temporarily close the opening before the work begins, to prevent construction dust, mortar or other building material from entering it.

Frequently Asked Questions – additional

Is the DN 80 plug interchangeable with the DN 60 plug?

No, these are different diameters intended for different flue pipes. Before ordering, it is necessary to accurately verify the actual diameter of the opening in your installation.

Can I use the plug during construction work on the facade?

Yes, temporarily fitting the plug before starting construction work near the flue penetration is a suitable measure to prevent construction dust or material from entering the pipe.

Procedure for identifying the correct diameter without original documentation

If you do not have the original technical documentation of the boiler and are unsure of the exact diameter of your flue pipe, we recommend the following simple identification procedure: physically measure the internal diameter of the opening at the location where the flue pipe was originally connected (on the facade, roof, or at the connection point to the chimney), and compare this value with the standard diameters commonly used on Vaillant boilers (for example DN 60 or DN 80). If you still have doubts, we recommend sending us a photo of the opening together with an approximate measurement – based on this information, we will be happy to help confirm the correct plug diameter before you order it.

Sealing in the context of overall facade or roof renovation

When planning a facade renovation (for example insulation) or roof renovation, where the decommissioning or replacement of an old chimney outlet is also being addressed at the same time, we recommend coordinating the installation of this plug with the construction work schedule – in some cases, it may be more advantageous to carry out a permanent structural sealing of the penetration directly as part of the larger facade renovation, rather than just fitting the plug, since this more comprehensive solution will ensure better long-term thermal and moisture insulation of that spot than simply fitting a plug into the original opening. In such a case, we recommend discussing this matter directly with the construction company carrying out the facade or roof renovation.

Summary

The DN 80 flue plug is a relatively inexpensive yet important component that ensures safe and reliable sealing of an unused opening left after a disconnected flue pipe. We recommend considering its use whenever replacing a boiler with a different flue system, during long-term decommissioning of the appliance, or during construction work near the pipe penetration. Before ordering, it is essential to accurately verify the diameter of your pipe – if in doubt, our team is ready to help identify the correct variant based on a photo or description of your specific situation.

Recommendation for installation and service companies

We recommend that installation and service companies that regularly carry out boiler replacements keep this plug (along with the DN 60 variant) as a standard part of their stock, in case a customer additionally requests proper sealing of the original, now unused flue opening during a boiler replacement. This preparedness allows the entire replacement, including the responsible decommissioning of the old flue system, to be completed in a single visit, without the need to order a missing part after the need is identified on site.

Relation to applicable legislation on gas appliances

Proper and safe decommissioning of a gas appliance, including its flue system, is part of the generally recognised requirements for the safe operation of gas equipment – leaving an unsecured, freely open flue pipe after disconnecting a boiler would not comply with standard professional practice or building safety requirements, as it could pose a risk of external influences penetrating the interior space, or, in shared systems, a risk to other connected units. This plug is therefore a suitable and recommended solution to this obligation whenever replacing or permanently decommissioning a boiler with a DN 80 flue pipe.

For any questions regarding the correct procedure for decommissioning your old boiler, including choosing the appropriate plug and its installation, our team is available for a free consultation – please do not hesitate to contact us before carrying out the replacement or decommissioning itself.

We are convinced that even such an apparently small and unremarkable component plays an important role in the responsible and safe end-of-life decommissioning of an old heating appliance, and we therefore give it the same expert attention in our advice as we do to larger and more expensive components of the entire heating system. Feel free to contact us at any time – we will be happy to help you choose and order exactly the variant that matches your specific situation, whether it is a simple home installation or a larger project involving the replacement of several boilers in an apartment building.

Storage and handling before installation

Until installation, we recommend storing the plug in a dry and clean environment, protected from mechanical damage, so that it retains its declared sealing properties. During transport and handling before installation, no special precautions are needed beyond the usual care taken when handling construction or plumbing materials, as this is a fairly robust and low-maintenance component without sensitive electronic or fragile mechanical parts.

Additional parameters

Category: Vaillant – valves, insulation and installation kits
Warranty: 2 years
Weight: 1.5 kg
Brand: Vaillant
Type: Flue pipe blanking plug
Diameter (DN): 80 mm
Purpose: sealing an unused flue opening
Material: resistant to temperature and weather effects
Installation: fitting into the pipe opening according to the instructions
Country of origin: Germany
Warranty: 2 years

Product rating

Be the first who will post an article to this item!

Do not fill out this field

How would you rate this product? Choose 1 to 5 stars, where 1 is the worst and 5 is the best rating.

Discussion

Be the first who will post an article to this item!

Do not fill out this field

About the company

The Vaillant Group is synonymous with heating and hot water preparation, placing particular emphasis on quality, reliability and user comfort. Its heating technology products are present in more than 100 countries around the world. The group unites the brands Vaillant, Saunier Duval, AWB, Bulex, DemirDöküm, Glow worm, Hermann Saunier Duval and Protherm. Each of these brands has extensive experience in the production of heating equipment, as most of them have been active in this segment for more than 80 years. With its 140 years of market presence, the brand Vaillant is among the largest and most significant. It has long been a market leader and a pioneer in the development and innovation of heating technologies in Europe. The Vaillant Group has an extensive network of sales representatives and thousands of satisfied customers around the world.

The extensive portfolio of the Vaillant Group includes modern heating technologies that are energy-saving, efficient and contribute to environmental protection. Thanks to a wide range of products and models, every customer can find exactly what they need here. The range includes wall-hung and floor-standing boilers, hot water storage tanks or electrical appliances. In the market of wall-hung boilers, the company is even number one in Europe with a 26 percent market share. The Vaillant Group is not specialized only in the development and production of boilers; its product portfolio also includes technologies that use renewable energy sources, such as solar systems or the most modern heat pumps and air conditioners. It also offers recovery or cogeneration units or zeolite heat pumps to users.

Vaillant Group thinks ahead every day and offers individual solutions for every need and type of energy. Its success is also based on research and development, which always takes place in line with the wishes of customers. The company's research and development department is among the largest and above all the most creative departments in this segment. The team of developers is constantly working on new devices and technological systems that are increasingly easy to operate and already meet the demands of tomorrow. Whether it is about energy solutions of the future or about the best way to use fossil fuels, the company Vaillant Group tries to anticipate new trends and to be always one step ahead of others. Proof of this is the registration of up to 100 new patents every year. In the field of production, the company places the greatest emphasis on achieving the highest quality of boilers, which represents perfection in every detail.

The Vaillant Group has its presence in most countries of the world. Slovakia is no exception, where the company Vaillant Group Slovakia, s. r. o. is located, representing the brands Vaillant and Protherm. Heating equipment of the Vaillant Group is produced in seven production plants, two of which are located on our territory. These factories employ more than 1,300 people in total. The production plant Protherm Production with its headquarters in Skalice specializes in the production of electric and floor-standing boilers for all brands belonging to the Vaillant Group. It can also boast its own research and development center, which is among the most modern in Europe. The second production plant in Slovakia is Vaillant Industrial Slovakia in Trenčianske Stankovce, which produces modules for wall-hung boilers for the entire group.

History of the company Vaillant

The history of the company Vaillant goes back to the year 1874, when it was founded by Johann Vaillant in Remscheid, Germany. Since then, the company Vaillant has been a leader in the field of heating and ventilation technologies.

History of the company Vaillant 

1874 Plumber Johann Vaillant founded the company.

1894 Patented for the invention of a gas water heater with a "closed system" design.

1899 Registered company logo, the Easter Bunny.

1905 Development of a wall-mounted water heater, patented under the designation "Geyser".

1924 Development of a wall-mounted boiler for heating.

1955 Production of the millionth appliance after the end of the Second World War.

1960 Production of electrical appliances begins.

1967 Development of a combined wall-mounted boiler.

1974 11 million appliances sold since 1974.

1992 Establishment of subsidiary companies – in the Czechoslovak Republic, Hungary, Poland and Turkey.

1993 Separation of Czechoslovakia leads to the creation of a separate sales representation in Slovakia.

1999 Anniversary, 125th anniversary of the founding of the company, 40 million appliances sold in the entire history of the company.

2001 The Vaillant Group is formed, covering eight significant manufacturers of heating equipment in Europe, including the boiler manufacturer Protherm in Slovakia.

2003 The Vaillant Group production plant in Skalice specializes in the production of floor-standing boilers also for other brands belonging to the VG group.

2004 Vaillant Group opens a new production plant in Trenčín, Slovakia, for the production of hydraulic groups for wall-hung boilers.

2009 10,000,000 modules for heating equipment produced at the VG Trenčín plant.

Easter Bunny in the logo - intended for the success of the company

Pink dwarfs and cute animals stand around and admire the miracle of the egg. Johann Vaillant is fascinated by the scene and decides to buy both the picture and the copyright. For Vaillant, this means the establishment of its brand and an extremely successful story.

Very distinctive brand profile

Since 1899, the motif has adorned all products, catalogs and brochures. In a few short years, Vaillant built an excellent reputation that spread throughout Germany and even beyond its borders. Vaillant gave its logo clear lines and outlines. "The Bunny in the Egg" remains the central theme, but the word "Vaillant" is added.

Many Germans know that the Vaillant Bunny belongs to a company based in North Rhine-Westphalia. Moreover: more than 70% of all Germans have heard of the company Vaillant. In Austria and the Netherlands, the company achieves similar results for its image.

Sustainability 

As a forward-looking, family-owned company, we accept special responsibility for the environment, for our employees and for society. We are convinced that economic success, sustainable and profitable growth are inseparably linked to a commitment to social and ecological standards.

In order to fulfill this commitment, we are committed to carrying out our activities in a sustainable manner within the strategic S.E.E.D.S. Program (Sustainability in Environment, Employees, Development & Products and Society). The definition of these areas of interest is based on a comprehensive understanding of sustainability, in which we also take into account key issues of our core activities.

 

 

 

Vytvořil Shoptet | Design Shoptak.cz.