Vaillant quick-fit set L10 for ecoCOMPACT/auroCOMPACT

Code: 0020170507
Not rated Rating details
780 € –5 %
780 € –5 % 741 € / pcs 602,44 € excl. VAT Measure price:
International delivery
In stock at supplier

Detailed information

Product detailed description

Quick-fit set L10 for Vaillant ecoCOMPACT and auroCOMPACT

The quick-fit set L10 is an original Vaillant hydraulic accessory for stationary condensing boilers with an integrated cylinder from the ecoCOMPACT and auroCOMPACT ranges. It includes a high-efficiency circulation pump together with a low-loss header (hydraulic separator) and related connection accessories, which together provide hydraulic separation of the boiler circuit from one direct (unmixed) heating circuit in the system. The set is fitted directly inside the boiler casing, meaning it does not take up any additional space in the boiler room in the form of an external manifold or hydraulic module.

The designation "L10" is based on the modular logic Vaillant uses for hydraulic accessories for ecoCOMPACT and auroCOMPACT – the L10 set represents the basic, first level with one direct heating circuit, which can be followed up, depending on the needs of a specific installation, with another set (L11 for a second, mixing circuit, or L20 for a second direct circuit), allowing a system with two independently controllable heating circuits to be hydraulically served from a single boiler body.

Technical characteristics

  • Intended for: Vaillant ecoCOMPACT (VSC, VCC) and auroCOMPACT (VSC D)
  • Function: hydraulic separation of the boiler circuit from the system's first direct (unmixed) heating circuit
  • Main components: high-efficiency, electronically controlled class A circulation pump, low-loss header (hydraulic separator), connection fittings and mounting material
  • Pump control: stepless speed adjustment according to the current circuit demand, controlled by the boiler's control system
  • Installation: directly inside the boiler casing, without the need for an external manifold or hydraulic module outside the boiler
  • Combinability: basic set for the first heating circuit; combined with the additional L11 set (mixing circuit) or L20 (second direct circuit), it allows two heating circuits to be served from one boiler
  • Max. operating temperature: up to 110 °C
  • Fitting material: brass/steel depending on the specific component, resistant to typical heating water parameters

Why this set is a practical solution

ecoCOMPACT and auroCOMPACT boilers are designed so that most of the hydraulic accessories needed for a typical system connection can be built directly into the boiler casing instead of installing a separate external manifold or hydraulic module next to the boiler. The L10 set is the first and basic step of this modular concept – it provides the low-loss header (hydraulic separation of the boiler circuit from the system) and a pump for one direct heating circuit, which covers the needs of simpler systems with one heating circuit (for example, a radiator system without mixing, or underfloor heating with its own separate mixing station outside the boiler).

For systems with several heating circuits requiring different water temperatures (for example, a combination of radiators and underfloor heating in one building), the L10 set forms the basis to which the additional L11 or L20 set is subsequently added, depending on whether the second circuit requires mixing (a lower, separately controlled temperature) or is again direct.

Installation

The set must be installed exclusively by an authorised technician qualified to install gas and heating equipment, in accordance with the manufacturer's installation instructions and the designed hydraulic scheme of the system. The set is built into the boiler casing at the location designated by the manufacturer, the pump and low-loss header are connected to the heating distribution of the first circuit, and finally the parameters of that circuit (for example the maximum temperature, or a weather-compensation curve if the circuit is controlled according to outdoor temperature) are set in the boiler control.

If a combination with another circuit (set L11 or L20) is planned, we recommend considering and ordering both sets together already during the first installation of the boiler, as adding the second set after years of operation is technically possible but usually requires a longer system shutdown than if both sets were installed at once.

Compatibility

The L10 set is intended for Vaillant stationary condensing boilers with an integrated cylinder from the ecoCOMPACT (VSC, VCC) and auroCOMPACT (VSC D) ranges. It can be combined with the additional L11 set (for a second, mixing circuit) and L20 (for a second direct circuit) within the same modular accessory family. The set is not interchangeable with hydraulic accessories intended for other Vaillant boiler ranges (for example wall-mounted ecoTEC plus or stationary ecoVIT), which have a different design and method of integrating hydraulic components.

When ordering, we therefore always recommend specifying the exact boiler model the set is to be fitted to.

Maintenance and care

As part of the regular annual boiler service inspection, we recommend also checking the components of this set:

  • smooth running and noise level of the pump,
  • tightness of the connection fittings between the low-loss header and the heating distribution,
  • functionality of the electronic pump speed control in relation to the circuit's demands,
  • overall condition and any deposits in the pump's circulation section during professional disassembly at service.

The electronically controlled class A pump requires no lubrication or other manual maintenance during normal operation; however, the quality of the heating water in the system is important and should comply with the recommendations of the VDI 2035 guideline.

We recommend including this check in the regular scope of the annual boiler service inspection, so that any pump wear or connection leaks are detected early, before they could affect heating comfort in the given circuit.

Why choose an original Vaillant part

The L10 set is designed specifically to fit inside the casing of ecoCOMPACT and auroCOMPACT boilers without the need for additional modifications or an external manifold, which simplifies installation and saves space in the boiler room. An original part also guarantees proper cooperation with the boiler's control electronics, which regulate the pump speed according to the current demand of the circuit. Using a non-original or universal pump would require a separate external manifold and would lose the advantage of a compact installation directly inside the boiler.

Modular concept of the L10, L11 and L20 hydraulic sets

Vaillant has designed the hydraulic accessories for ecoCOMPACT and auroCOMPACT as a modular system of three mutually combinable sets, which covers the most common hydraulic configurations of family houses and smaller buildings without the need to individually design an external manifold:

  • L10 – basic set, high-efficiency pump with low-loss header for one direct heating circuit, can be installed on its own or as a basis for further expansion,
  • L11 – additional set, high-efficiency pump with a three-way mixing valve and actuator, installed together with L10 and used for a second, mixing (controlled) circuit, for example for underfloor heating with a lower temperature than a direct radiator circuit,
  • L20 – additional set, high-efficiency pump with hydraulic accessories, installed together with L10 and used for a second direct (unmixed) circuit, for example for a separate heating branch with the same temperature as the first circuit.

This concept allows the designer to choose exactly the combination that matches the actual needs of a specific building – a simple system with one circuit only needs the L10 set alone, while a system combining, for example, radiators (direct circuit) and underfloor heating (mixing circuit) requires a combination of L10 + L11.

Typical usage scenarios

In practice, the L10 set alone, without the additional L11 or L20, is most often chosen for simpler family houses with one type of heating emitter (for example only radiators, or only underfloor heating with its own external mixing station outside the boiler). Conversely, for buildings combining several types of heating emitters or with separate zones requiring different heating water temperatures (typically a ground floor with underfloor heating and an upper floor with radiators), L10 is combined with L11 or L20 already during the first installation of the boiler, to avoid a more complicated additional installation later.

When deciding between the individual combinations, we always recommend basing the choice on the specific heating design of the building in question, as changing the chosen hydraulic solution after installation is technically more demanding than making the right choice from the start.

Frequently asked questions

What exactly does the designation L10 mean compared to L11 and L20?

L10 is the basic set for the first, direct (unmixed) heating circuit. L11 adds a second, mixing circuit with a three-way valve and actuator to the system, while L20 adds a second direct circuit without mixing. Both L11 and L20 are always installed together with the L10 set, not on their own.

Is the L10 set sufficient for a system with one heating circuit?

Yes, for a system with one direct heating circuit (for example a simple radiator system), the L10 set is a sufficient solution and no additional sets need to be purchased with it.

Can the L10 set be fitted later to an already installed boiler?

Technically yes, but a later installation requires the system to be shut down and intervention in the boiler casing. For a planned installation, we therefore recommend considering the required number of circuits in advance and ordering the relevant sets together with the boiler.

Is an external manifold needed in addition to this set?

No, the main advantage of this set is precisely that the pump and low-loss header are built directly into the boiler casing, which eliminates the need for a separate external hydraulic manifold for one direct circuit.

Can I install the set myself?

No, installation requires intervention in the boiler casing and professional qualification to install gas and heating equipment, so it may only be carried out by an authorised service technician.

Does the electronically controlled pump in this set save energy?

Yes, the class A pump continuously adjusts its speed according to the current demand of the circuit instead of running at constant speed, bringing energy savings compared to older, uncontrolled pumps.

Is the set suitable for underfloor heating as well?

The L10 set handles a direct (unmixed) circuit. Underfloor heating usually requires a lower, controlled temperature, so when combined with a radiator circuit it is usually handled as a second, mixing circuit using the additional L11 set, or with a separate external mixing station outside the boiler.

What warranty applies to this set?

Original Vaillant accessories are covered by a standard 24-month warranty from the date of sale, or from commissioning by an authorised service technician.

How do I find out whether my specific project needs only L10, or also L11/L20?

The decisive factor is the number and type of heating circuits in the heating system design. We recommend consulting this choice with a heating designer or supplier, who will determine, based on the hydraulic scheme of the building, how many circuits and of what type (direct or mixing) the system requires.

Does this set also affect domestic hot water preparation in the boiler's integrated cylinder?

No, the L10 set only handles the hydraulics of the heating circuit. Domestic hot water preparation in the integrated cylinder of ecoCOMPACT/auroCOMPACT boilers is handled separately, structurally independent of this hydraulic set.

Can a third heating circuit be added later?

The modular L10/L11/L20 concept built directly into the boiler casing covers a maximum of two heating circuits. If a third or further circuit is needed, the solution must be designed with an external hydraulic manifold outside the boiler, which we recommend discussing with a heating system designer already at the design stage.

How does the L10 set differ from a regular external circulation pump?

The main difference lies in being built directly into the boiler casing and in the included low-loss header (hydraulic separator), which provides hydraulic separation of the boiler and system circuits – a regular external circulation pump would not provide this low-loss header function and would require a separate external manifold.

Additional parameters

Category: Vaillant – valves, insulation and installation kits
Warranty: 2 years
Weight: 15 kg
Brand: Vaillant
Product type: Quick-fit hydraulic set with pump (basic set L10)
Intended for: Vaillant ecoCOMPACT (VSC, VCC) and auroCOMPACT (VSC D)
Function: High-efficiency pump with low-loss header (hydraulic separator) and accessories for 1 direct (unmixed) heating circuit
Installation: Fits directly inside the boiler casing, no external manifold required
Pump class: High-efficiency, electronically controlled class A circulation pump
Included in delivery: Pump, low-loss header (hydraulic separator), connection fittings, mounting material
Combinability: Basic set for 1st heating circuit; with the additional L11 or L20 set allows 2 heating circuits
Max. operating temperature: up to 110 °C
Country of origin: Germany / EU (Vaillant Group)
Warranty: 24 months

Product rating

Be the first who will post an article to this item!

Do not fill out this field

How would you rate this product? Choose 1 to 5 stars, where 1 is the worst and 5 is the best rating.

Discussion

Be the first who will post an article to this item!

Do not fill out this field

About the company

The Vaillant Group is synonymous with heating and hot water preparation, placing particular emphasis on quality, reliability and user comfort. Its heating technology products are present in more than 100 countries around the world. The group unites the brands Vaillant, Saunier Duval, AWB, Bulex, DemirDöküm, Glow worm, Hermann Saunier Duval and Protherm. Each of these brands has extensive experience in the production of heating equipment, as most of them have been active in this segment for more than 80 years. With its 140 years of market presence, the brand Vaillant is among the largest and most significant. It has long been a market leader and a pioneer in the development and innovation of heating technologies in Europe. The Vaillant Group has an extensive network of sales representatives and thousands of satisfied customers around the world.

The extensive portfolio of the Vaillant Group includes modern heating technologies that are energy-saving, efficient and contribute to environmental protection. Thanks to a wide range of products and models, every customer can find exactly what they need here. The range includes wall-hung and floor-standing boilers, hot water storage tanks or electrical appliances. In the market of wall-hung boilers, the company is even number one in Europe with a 26 percent market share. The Vaillant Group is not specialized only in the development and production of boilers; its product portfolio also includes technologies that use renewable energy sources, such as solar systems or the most modern heat pumps and air conditioners. It also offers recovery or cogeneration units or zeolite heat pumps to users.

Vaillant Group thinks ahead every day and offers individual solutions for every need and type of energy. Its success is also based on research and development, which always takes place in line with the wishes of customers. The company's research and development department is among the largest and above all the most creative departments in this segment. The team of developers is constantly working on new devices and technological systems that are increasingly easy to operate and already meet the demands of tomorrow. Whether it is about energy solutions of the future or about the best way to use fossil fuels, the company Vaillant Group tries to anticipate new trends and to be always one step ahead of others. Proof of this is the registration of up to 100 new patents every year. In the field of production, the company places the greatest emphasis on achieving the highest quality of boilers, which represents perfection in every detail.

The Vaillant Group has its presence in most countries of the world. Slovakia is no exception, where the company Vaillant Group Slovakia, s. r. o. is located, representing the brands Vaillant and Protherm. Heating equipment of the Vaillant Group is produced in seven production plants, two of which are located on our territory. These factories employ more than 1,300 people in total. The production plant Protherm Production with its headquarters in Skalice specializes in the production of electric and floor-standing boilers for all brands belonging to the Vaillant Group. It can also boast its own research and development center, which is among the most modern in Europe. The second production plant in Slovakia is Vaillant Industrial Slovakia in Trenčianske Stankovce, which produces modules for wall-hung boilers for the entire group.

History of the company Vaillant

The history of the company Vaillant goes back to the year 1874, when it was founded by Johann Vaillant in Remscheid, Germany. Since then, the company Vaillant has been a leader in the field of heating and ventilation technologies.

History of the company Vaillant 

1874 Plumber Johann Vaillant founded the company.

1894 Patented for the invention of a gas water heater with a "closed system" design.

1899 Registered company logo, the Easter Bunny.

1905 Development of a wall-mounted water heater, patented under the designation "Geyser".

1924 Development of a wall-mounted boiler for heating.

1955 Production of the millionth appliance after the end of the Second World War.

1960 Production of electrical appliances begins.

1967 Development of a combined wall-mounted boiler.

1974 11 million appliances sold since 1974.

1992 Establishment of subsidiary companies – in the Czechoslovak Republic, Hungary, Poland and Turkey.

1993 Separation of Czechoslovakia leads to the creation of a separate sales representation in Slovakia.

1999 Anniversary, 125th anniversary of the founding of the company, 40 million appliances sold in the entire history of the company.

2001 The Vaillant Group is formed, covering eight significant manufacturers of heating equipment in Europe, including the boiler manufacturer Protherm in Slovakia.

2003 The Vaillant Group production plant in Skalice specializes in the production of floor-standing boilers also for other brands belonging to the VG group.

2004 Vaillant Group opens a new production plant in Trenčín, Slovakia, for the production of hydraulic groups for wall-hung boilers.

2009 10,000,000 modules for heating equipment produced at the VG Trenčín plant.

Easter Bunny in the logo - intended for the success of the company

Pink dwarfs and cute animals stand around and admire the miracle of the egg. Johann Vaillant is fascinated by the scene and decides to buy both the picture and the copyright. For Vaillant, this means the establishment of its brand and an extremely successful story.

Very distinctive brand profile

Since 1899, the motif has adorned all products, catalogs and brochures. In a few short years, Vaillant built an excellent reputation that spread throughout Germany and even beyond its borders. Vaillant gave its logo clear lines and outlines. "The Bunny in the Egg" remains the central theme, but the word "Vaillant" is added.

Many Germans know that the Vaillant Bunny belongs to a company based in North Rhine-Westphalia. Moreover: more than 70% of all Germans have heard of the company Vaillant. In Austria and the Netherlands, the company achieves similar results for its image.

Sustainability 

As a forward-looking, family-owned company, we accept special responsibility for the environment, for our employees and for society. We are convinced that economic success, sustainable and profitable growth are inseparably linked to a commitment to social and ecological standards.

In order to fulfill this commitment, we are committed to carrying out our activities in a sustainable manner within the strategic S.E.E.D.S. Program (Sustainability in Environment, Employees, Development & Products and Society). The definition of these areas of interest is based on a comprehensive understanding of sustainability, in which we also take into account key issues of our core activities.

 

 

 

Vytvořil Shoptet | Design Shoptak.cz.