Complex pre-filter IVAR.CF for the IVAR.CROSS 90 unit – SALE
Code: ESCPVDFROProduct detailed description
The first two purification stages
The CF cartridge forms the first and second filtration stages of the IVAR.CROSS 90 BALANCE unit. The composite polypropylene filter retains sand, silt and rust particles, while the activated carbon block reduces residual chlorine, organic impurities and chlorine compounds. The reverse osmosis membrane after it therefore receives pre-treated water.
Replacement
- every 12 months or after 4000 l of treated water
- the unit signals the replacement with the CF indicator
- late replacement can damage the RO membrane
If filtration performance drops significantly and a new CF cartridge does not help, it is time to replace the membrane as well (ESCSVRO600DFRO).
Technical data
| Code | ESCPVDFRO |
| Brand | IVAR |
| Type | IVAR.CF |
| Kind | complex pre-filter (stages 1 and 2) |
| Material | composite PP + activated carbon block |
| Intended for | IVAR.CROSS 90 BALANCE (ESMO3600MPECO) |
| Replacement interval | 12 months / 4000 l |
| Pack size | 1 piece |
Frequently asked questions
How often is the CF pre-filter replaced?
Every 12 months or after 4000 l of treated water. The unit signals the replacement with the CF indicator.
What happens if I postpone the replacement?
Late replacement of the filter cartridges can damage or even destroy the reverse osmosis membrane. Replace the pre-filter in good time.
Additional parameters
| Category: | UV lamps and reverse osmosis systems |
|---|---|
| Warranty: | 2 years |
| Code: | ESCPVDFRO |
| Brand: | IVAR |
| Type: | IVAR.CF |
| Kind: | complex pre-filter (stages 1 and 2) |
| Material: | composite PP + activated carbon block |
| Intended for: | IVAR.CROSS 90 BALANCE (ESMO3600MPECO) |
| Replacement interval: | 12 months / 4000 l |
| Pack size: | 1 piece |
Product rating
Be the first who will post an article to this item!
Discussion
Be the first who will post an article to this item!
IVAR designs, develops and manufactures highly energy-efficient heating and plumbing systems. We have over 10,000 catalogue items - mass-produced products and unique items - in addition to customised systems and combinations of complex products. And it’s all “Made in Italy”.
Vision
To make life easier for our clients, our clients' customers and our employees, thanks to our ability to be constantly innovative.
Mission
To design and manufacture advanced hydronic solutions that reduce installation complexity and energy consumption.
“Made in Italy” adds value
IVAR has been producing heating and plumbing system components since 1985: valves for heating bodies, direct heat metering modules, heat cost allocators, pipes and fittings, substations for heating systems, distribution manifolds, radiant panel systems, and components for solar and geothermal systems. And it’s all “Made in Italy”.
Over 200 people are employed at our manufacturing facilities in Prevalle (in northern Italy’s Brescia province). The site has been designed to streamline our many production and operational stages.
The Italian headquarters also acts as a hub for the wider IVAR Group, set up with the goal of distributing products beyond Italy’s borders. The group now has 11 branches, in Australia, Belgium, China, Germany, the United Kingdom, the Czech Republic, Romania, Slovakia, Spain, the United States and Tunisia.
Know How
Research, development and numerous laboratory tests guarantee that our clients’ requests can be translated into new high-efficiency products.
The stages required for production take place internally, beginning with hot forming, which is carried out at our subsidiary Valmon Stampati. Our continuous implementation of projects under the Industry 4.0 initiative also allows us to take full advantage of new releases in technology and IT to improve our manufacturing efficiency.
As a company, IVAR is constantly evolving. Every day, we invest in strengthening our products, in improving our production processes and in attaining new patents and certifications.
